Zulily Fulfillment Process

 

Process

  1. Pull a box from the flow rack for the location you are shipping
  2. Create a new transfer under receiving
    1. Go to the receiving tab of the ERP.
    2. Click on the red box labeled “Receiving” in the text field at the top of the page.
    3. Select Transfer from the drop-down menu
    4. On the right-hand side input “DC Plain City” in the first box, and the location the box is going to in the second box (Bethlehem PA, Lockbourne OH, McCarran NV)

    5. Pull an item from the box, verify it is going to the correct location, and scan the item’s UPC from the box in the top text field
    6. Repeat until all items have been scanned in
    7. After completion labels for the box will be printed
  3. Apply the printed labels to the top right-hand corner of the short side of the box
  4. Apply the carton number label to the top left-hand corner of the short side of the box
  5. Stack the box with the labels facing out on the pallet designated for that location

 

Common Issues: